Step1: Created loop cut in the top step pf pyramid (1m)
Step2: Removed the steps from the section
Step3: Use the two middle edges to create the ramp
Step4: Used loop cut to create sections in ramp and used snap to make sure they were aligned
Step5: Removed double vertices
Step6: Filled the triangle gaps
2 Likes
Got the job done. Now for the rails.
1 Like