Bardy Python Work Breakdown Structure

Combat
Hitpoints
Special Attacks
Gain one ability after each game level
Possibly choose one of two after each level
Attacks
Melee
Ranged

Rewards/Loot
Player may get coins or gold that they could spend to learn new songs(passive abilities) that can help them along the way

Quests
Basic story not so much about questing. Get from A to B to C then defeat evil villain.
Possible “Cutscene” after each level that will progress the story of the Bard vs the evil villain
Character dialogue
Popup system that happens randomly during combat.
Funny snippets of dialogue the player or enemies will say.

Enemies
Attacks
Ranged
Melee
Bosses
Main Boss on level 4
Mini Bosses at end of each level
Animations
Death Animations
Attack Animations

1 Like