Why is it 1.5/-1.5 when moving the loop cuts?

As the following screenshot shows, the loop cuts were moved 1.5 and -1.5 along the Y axis respectively. But the whole width (along the Y axis) of the lowest layer of the pyramid is 2, since the coordinates of the left bottom corner are (1, -1, 0) and the right bottom corner are (1, 1, 0).

So my question is why the values used to move the loop cuts, i.e. 1.5 and -1.5 are not consistent with the values in the Y axis?

Thank you.

My understanding is the 1.5 and -1.5 are units measured from the origin of the loop cut. In other words 1.5 units in each direction from the center. (but remember it is only counted from the center, because that is where the loop cut was placed.)